You must obtain a Wood County Highway permit for the following:
DRIVEWAY INSTALLATION
Cost: $20.00
Any time a new access point is needed off of a County Trunk Highway, you will need
to obtain a “driveway permit”. You must also obtain the permit if a revision or
addition is made to any existing driveway/access point. See the driveway permit
for construction details and restrictions.
Driveway Permit Application
UTILITY PERMIT
Application: $ 25.00
Boring Fee: $ 25.00
Open Cut Fee: $ 250.00
Permit to construct, operate and maintain utilities within highway right-of-way.
Utility Permit Application
OVERSIZED LOAD
Cost: $ 25.00
When moving an oversized load on any Wood County Trunk Highway, whereby the load
will be over length, width, height, or weight, you must obtain an Oversized Load
Permit.
Oversized Load Permit Application
SPECIAL EVENT – DETOUR
No fee
Permit to be obtained whenever there is a type of function or gathering that is
to take place on a County Trunk Highway whereby traffic is to be delayed or detoured.
Special Event
Permit Application
NOTE: PERMITS STATED ABOVE HAVE THEIR OWN GENERAL REQUIREMENTS, RESTRICTIONS, PROVISIONS
AND/OR CONDITIONS AND SOME WILL HAVE SPECIAL PROVISIONS ATTACHED TO THE PERMIT WHICH
ARE TOO NUMEROUS TO HIGHLIGHT ABOVE. PLEASE READ EACH PERMIT IN ITS ENTIRETY FOR
ALL REQUIREMENTS/RESTRICTIONS.
|